Contact Form

Name

Email *

Message *

Cari Blog Ini

Dota 2 Patch 733 Release Time

Dota 2 Patch 7.33 Release Date and New Features

Delayed Patch Release After Longest Dota 2 Patch in History

Dota 2 Patch 7.32 has been the longest in the game's history, lasting an astonishing 195 days. Valve has finally announced the release date for the highly anticipated Patch 7.33: March 6, 2023.

Lotus Pool and Healing Lotus Changes

New Lotus Pools

Two new Lotus Pools have been added to the edges of the map near the river. Every 3 minutes, each Lotus Pool spawns 1 Healing Lotus up to a total of 6 available at a time.

Channeling Lotus Pools

Lotus Pools can be channeled to grant 1 Healing Lotus per second. Healing Lotus is a stackable consumable that replenishes 125 HP and 125 Mana on use.

Channel Time and Charge Time Adjustments

The maximum channel time has been increased from 2s to 22s, and the time to reach maximum charge has been increased from 15s to 17s. The minimum charge distance has been decreased from 300 to 100, and it is no longer reduced by damage block.

Dota 2 Patch 7.33 Release Date

The official release date for Dota 2 Patch 7.33 is March 6, 2023. However, Valve has recently announced that the patch will be released a day after the conclusion of the Lima Major on March 12, 2023.


Comments